The Unit Availability and Capacity Factors are as follows:
|
|
January 2026 |
Year-to-Date |
|
Availability Factor (AF) |
31.29% |
31.29% |
|
Capacity Factor (CF) |
12.74% |
12.74% |
For the 2026 operating year, below is the monthly generation data and historical average monthly generation data for the project. As of January 2026, the Berkshire Wind Power Project completed 177 months of operation.
Throughout the month of January, total production from Berkshire Wind Phase 1 was 1,422.21 MWh. This is significantly lower than the historical average for the month of December, 2,936.1 MWh. This decrease in production was due to lower project availability. 

Berkshire Wind Phase II
The Unit Availability and Capacity Factors are as follows:
|
|
January 2026 |
Year-to-Date |
|
Availability Factor (AF) |
87.83% |
87.83% |
|
Capacity Factor (CF) |
49.97% |
49.97% |
For 2026 operating year, below is the monthly generation data for the project. As of January 2026, the Berkshire Wind Phase 2 project completed 76 months of operation.
Throughout the month of January, total production from Berkshire Wind Phase 2 was 1,710.24 MWh. This is significantly higher compared to our historic January average of 1,209.6 MWh. Higher generation is due to this month continuing to have exceptionally high availability as it has for the past 10 months.