Operations

 

 

 

 

 

 

 

 

 

 

 

 

 

Berkshire Wind Phase I

The Unit Availability and Capacity Factors are as follows:

 

  August 2021

 Year-to-Date

Availability Factor (AF)

        80.53%

          75.78%

Capacity Factor (CF)

         14.32%

          22.78%

For the 2021 operating year, below is the monthly generation data and historical average monthly generation data for the project. As of August 2021, the Berkshire Wind Power Project completed 123 months of operation.

  • Average Capacity Factor for the month of August since COD: 20.33%
  • Capacity Factor since COD: 40.29%

Through the month of August, total production from Berkshire Wind Phase 1 was 1,589 MWh. This was lower than our historical average monthly production of 2,057 MWh. This reduction in generation was due to a turbine parts delay from GE.

Berkshire Wind Phase II

The Unit Availability and Capacity Factors are as follows:

 

 August 2021

 Year-to-Date

Availability Factor (AF)

       64.52%

          90.39%

Capacity Factor (CF)

         6.38%

          29.66%

For 2021 operating year, below is the monthly generation data for the project. As of August 2021, the Berkshire Wind Phase 2 project completed 23 months of operation.

  • Average Capacity Factor for the Month of August since COD: 15.84%
  • Capacity Factor since COD: 36.88%

Through the month of August, total production from Berkshire Wind Phase 2 was 233.66 MWh. This was lower than our historical average monthly production of 850.07 MWh.